Post by Goody's Atv on May 10, 2013 17:56:23 GMT -6
There's a drain/fill plug on the front of the carrier.
The footpeg mounts were bored out and steel tubing was inserted and welded. Tubes were also welded onto the frame in front of the motor. Do-it-yourself Pro-peg frame mounts.
Handmade sprocket cover. I took the Amplink off.
Upper shock mounts were removed and replaced with multi-holed mounts and custom billet ears. Adjustable ride height.